項目管理師考前模擬試題(二)及參考答案
1. Activity duration estimate inputs include all of the following except:
A. Resource requirements.
B. Basis of estimates.
C. Activity lists.
D. Constraints.
2. All of the following are contract types except:
A. Unit-price.
B. Make-or-buy.
C. Cost reimbursable.
D. Lump sum.
3. Initiation inputs for a project include all of the following except:
A. Product description.
B. Strategic plan.
C. Project charter.
D. Selection criteria.
4. Responses to risk threats include all of the following except:
A. Avoidance.
B. Acceptance.
C. Mitigation.
D. Rejection.
5. The process of performance reporting includes all of the following except _____________.
A. Status reporting.
B. Progress reporting.
C. Forecasting.
D. Product analysis
6. Constrained optimization methods of project selection include:
A. Scoring models.
B. Benefit-cost ratios.
C. Multi-objective programming algorithms.
D. Subjective analyses.
7. Which of the following statements concerning contract type is correct?
A. A fixed price contract contains the most risk for the buyer.
B. Cost reimbursable contracts offer sellers the highest profit potential.
C. Lump sum contracts offer sellers the greatest profit potential.
D. Unit price contracts are illegal in many jurisdictions.
8. A Work Breakdown Structure (WBS) numbering system should allow project staff to:
A. Identify the level at which individual WBS elements are found.
B. Identify configuration management milestones.
C. Estimate the costs of WBS elements.
D. Provide project justification.
9. All of the following are true quality statements except:
A. Quality improvement depends upon better definition and increased awareness of the
requirements/specifications.
B. Project quality management must address both management of the project and the product of the project.
C. Recognition of key actions required of each team member is necessary to meet quality objectives.
D. Computer-aided design systems can improve quality, but only at the expense of an increase in the cost of design.
10. All of the following are examples of tools often used in cost estimating except:
A. Parametric modeling.
B. Analogous estimating.
C. Bottom-up estimating.
D. Activity duration estimates.
11. At XYZ Inc., the hourly wage for semi-skilled workers is $14.00. The annual audit shows that fringe benefits cost 30% of basic wages, and that overhead costs are 60% of wages plus fringe benefits. What is the loaded” hourly wage for a semi-skilled worker at XYZ Inc.?
A. $27.14.
B. $28.96.
C. $30.03.
D. $29.12.
12. Of the following estimates, which most accurately reflect the actual cost of the project?
A. Conceptual estimates.
B. Order of magnitude estimates.
C. Preliminary estimates.
D. Bottom-up estimates.
13. The most crucial time for project risk assessment is:
A. When a problem surfaces.
B. During the planning phase.
C. During the close-out phase.
D. After the project schedule has been published.
14. When there is uncertainty associated with one or more aspects of the project, one of the first steps to take is to:
A. Revise project plan.
B. Conduct a risk-benefit analysis.
C. Conduct a needs analysis.
D. Increase the estimated cost of the project.
15. Including a contingency reserve in the project budget is intended to:
A. Reduce the probability of scope changes.
B. Increase the probability of scope changes.
C. Reduce the probability of a cost overrun.
D. Increase the probability of a cost overrun.
16. Given the information in the following table, what is the expected value from this risk event? Probability Result
A. -10,000.
B. - 7,500.
C. + 2,500.
D. -7,000.
17. A contractor is working on a fixed price contract that calls for a single, lump sum payment upon satisfactory completion of the contract. About halfway through the contract, the contractor project manager informs their contract administrator that financial problems are making it difficult for them to pay their employees and subcontractors. The contractor asks for a partial payment for work accomplished. Which of the following actions by the buyer is most likely to cause problems for the project? A. Starting partial payments for work accomplished.
B. Making no payments because it would violate the conditions of the contract.
C. Paying for work accomplished to date.
D. Negotiating a change to the payment conditions in the contract.
18. A precise description of a physical item, procedure, or service for implementation of an item or service is called :
A. Work package.
B. Baseline.
C. Product description.
D. Work breakdown structure (WBS) element.
19. A project should be terminated for all of the following reasons except:
A. Lack of team synergy.
B. The project no longer meets the company’s objectives.
C. The resources are not available to complete project activities.
D. Project funding has been significantly reduced.
20. One common way to compute estimated at completion (EAC) is to take the project budgeted-at-completion and:
A. Divide it by the schedule performance index.
B. Multiply it by the schedule performance index.
C. Multiply it by the cost performance.
D. Divide it by the cost performance index.
參考答案:
1.B 2.B 3.C 4.D 5.D 6.C 7.C 8.A 9.D 10.D 11.D 12.D 13.B 14.B 15.C 16.D 17.B 18.C 19.A 20.D
本站推薦
- 1裝飾行業(yè)施工項目管理erp系統(tǒng)助力高效成本控制與進(jìn)度監(jiān)管
- 2上海市政消防工程項目管理軟件助您高效管理項目成本與進(jìn)度
- 3上海市政消防工程項目管理系統(tǒng)助力高效消防工程建設(shè)與監(jiān)管
- 4監(jiān)理工程師必學(xué)軟件知識,用它做項目管理能替代人工嗎?
- 5工地現(xiàn)場用土建項目管理軟件,適配土建行業(yè)流程嗎?
- 6電力項目管理軟件公司助力高效項目執(zhí)行與成本精準(zhǔn)控制
- 7裝飾項目管理軟件費(fèi)用_工程核算 + 報價透明,裝修行業(yè)專屬管理工具
- 8運(yùn)輸包裝項目管理軟件助你高效管控項目成本與進(jìn)度
- 9裝飾常用項目管理erp系統(tǒng)助你高效管控項目成本與進(jìn)度