PMP認(rèn)證考試練習(xí)題及參考答案(五十四)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
1 Which of the following control types has the highest risk to the owner:A Firm fixed price (FFP)
B Time and material (T&M)
C Cost plus fixed fee (CPFF)
D Cost plus incentive fee (CPIF)
E A and B only
B
2 Which of the following contract types has the highest risk to the contractor:
A Firm fixed price (FFP)
B Time and material (T&M)
C Cost plus fixed fee (CPFF) 來源:考試大
D Cost plus incentive fee (CPIF)
E A and B only
A
3 Arbitration is a _____ approach to conflict management in resolving conflict disputes.
A lose-lose
B win-win
C win-lose
D lose-win
E closed door
A
4 Which of the following is not a method of government procurement.
A Assistance
B sealed bidding
C competitive proposals
D acquisition
E small purchases
D
5 The review for the specification completeness is performed during which of the following cycles.
A Award cycles
B requirements cycle
C requisition cycle
D solicitation cycle
E contractual cycle
C
6 In which of the following is the cost of risk hidden by the contractor?
A Firm Fixed Price Contract
B Fixed Price Plus Incentive
C Cost Plus Fixed Price
D Cost Plus Percentage of Cost
E A and B
D
7 The definitive terms of a contract are written during which of the following contract phases?
A Contract Phase
B Post-Award Phase
C Award Phase
D Pre-Award Phase
E Requirement Phase
C
8 The _____ specification delineates specific end use capabilities which can be tested in the acceptance procedure.
A performance
B functional
C technical
D base line http://ks.examda.com
E operational
B
9 Which one of the following is not an acquisition method?
A advertising
B invitation
C negotiation
D purchase
E all are acquisition methods
A
10 Which is not a negotiation tactic?
A Imposing deadlines
B surprises
C person with authority is absent
D reasoning together
E all are negotiations tactics
E
11 A warranty may not be a remedy for products delivered unfit when _____ .
A the PM has knowledge of the product, inspected it without relying on the seller's skill
B the products delivered comply with the plans and specifications of the client
C the plans and specifications produced by the seller match the completed product.
D A and B
E None of the above.
D
12 The Statement of Work (SOW) is developed during the _____ cycle.
A Award
B Solicitations
C requirements
D contractual
E requisitions
C
本站推薦
- 1PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目一馬當(dāng)先?答案當(dāng)然是肯定的!
- 2項(xiàng)目進(jìn)度管理有難題?PMP系統(tǒng):一問就知,輕松解決
- 3PMP項(xiàng)目管理,項(xiàng)目進(jìn)度管理的疑問終結(jié)者,您還在等什么?
- 4項(xiàng)目進(jìn)度難掌控?PMP管理系統(tǒng):疑問解答,效率倍增!
- 5PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目效率翻倍?答案就在這里!
- 6項(xiàng)目進(jìn)度滯后?PMP管理系統(tǒng):一問就知道怎么加速!
- 7項(xiàng)目管理不再迷茫,PMP進(jìn)度系統(tǒng):您的疑問我來答
- 8PMP在手,項(xiàng)目進(jìn)度管理難題還用問嗎?輕松搞定
- 9還在為項(xiàng)目進(jìn)度頭疼?PMP管理系統(tǒng)幫您一問解千愁!